Files
gods-eye-view/src
Sameh Khamis e37349a061 Move the transit head across subdivisions in the frame, and keep segmented lines safe beside the draped rework
The transit trail's head is upserted where the vehicle crosses into the next
subdivision, so the Cesium draw port moves it there in the same frame
instead of building it anew; between crossings a frame changes only how far
it is revealed. A test runs the trail through the Cesium draw port across a
crossing and a second's fade, with nothing built anew.

A segmented line that was replaced by a plain one and moved while its set
rebuilds is hidden segment by segment where it was. A segmented line of no
length is patched as nothing to draw instead of rebuilt on every upsert,
and segmented lines are noted as rebuilt when they move.
2026-11-07 07:59:33 -08:00
..