Files
gods-eye-view/src/overlays
German Khokhlov 834d34296f test(overlays): an allocation workload through the Navara projector
Review of Task 7: every allocation workload ran the Cesium engine on a mock
viewer with identity matrices and the horizon test off, so the per-label
horizon test and the Navara projector were never in the gate. The new
`navara-projector` profile gives the host the Navara engine's projector
(cameraMath worldToWindow, viewProjection, horizonVisible, as
createNavaraEngine wires it) over a real WGS84 camera 2 000 km up, with 250
moving labels on a lon/lat grid under it and the horizon test on.

Node 24.14 (the calibrated runtime; CI's 24.14.0 matrix leg runs the gate
with GEV_REQUIRE_ALLOCATION_GATE=1): 10 905 B/frame median (generic 250
labels: 9 681), 43.6 B per candidate; budget 13 000 B/frame as the generic
saturated workload. All 14 workloads pass on 24.14.
2026-10-16 22:26:04 +04:00
..