Each script launches and closes Chrome through scripts/qa/browser.mjs,
waits on the application through scripts/qa/ready.mjs instead of the
loading screen and fixed pauses, and reads the contract instead of
Cesium where the check is not about Cesium itself.
Main's work since the last merge runs on the globe contract where this
branch draws through it:
- Satellites take main's classes, sensors, ground-track bearings and
world time through contract points and rings; launches take the world
timeline. The satellite's cockpit subject dims, copies positions and
refocuses through the contract.
- Flights, military and vessels keep main's photos, retry cool-downs,
world-clock motion and the ship bridge. Trail seeding in the shared
aircraft tracking reads each layer's clock.
- Traffic's flow lines and single build draw as ground sets; transit
keeps dated credits and the new cities; CCTV opens the nearest camera,
and the Quebec overlay projects and tests the horizon through the
contract. Bikeshare's manager cleanup moved into its current lifecycle.
- Draw keeps main's mark actions across engine switches.
- The world clock in src/time is plain numbers again: Julian dates come
from src/geo, the frame loop is injected, and the binding to Cesium's
viewer clock lives in src/globe/cesium/worldTime.js. Navara's sky and
sun follow the world time; live feeds keep the real time.
- The cockpit's orbital view, with its sensor zoom, ground focus and
satellite switching, stays Cesium-only for now: Navara hides its entry.
Its Cesium calls live in src/globe/cesium/orbital.js. The ship bridge's
finest-detail waterline sampling is Cesium-only too; Navara samples
loaded geometry and detailed terrain. Both are in KNOWN-ISSUES.
- Main's tests that built a Cesium scene by hand run on the fake engine.
- The boundary manifest is regenerated, the coupling baseline records
the orbital and bridge code, and the main-chunk baseline is raised to
the merged size: main itself grew its main chunk by 93,959 bytes
(gzip -9) since the previous merge base.
Layer display tests no longer re-check Cesium primitives in every layer:
they run on the fake engine, and one Cesium translation check per ground
kind lives in the Cesium engine's ground tests. Their harnesses are shared,
and the fake-engine, Cesium-engine and flights tests that repeated the
contract suite are gone, 340 tests in all.
The press-travel measurement is shared by the selection dispatcher and
CCTV, which loses its ScreenSpaceEventHandler shim and world-click module.
ALPR, installations and bikeshare share one selection keeper and selected
marker write. Layers with their own click rules keep their handlers.
Navara's pulse is a class like the ground pass, the ground and imagery
passes share the surface uniforms, and the colour, log-depth and occlusion
GLSL lives in one chunk module, each caller keeping its depth bias. The
ground suite runs inside the contract suite (--only=ground:), and fixture
and script names say what they test.
Behaviour is unchanged on both engines.