Navara's own flight clock loses time on slow frames (a one-second flight
took 1.55 s at 50 ms frames and 3.1 s at 100 ms), so stories waited for
the director's timeout. The adapter now owns the flight deadline and lands
the camera on time. On Cesium a flight still counted as active inside its
complete callback, because Cesium removes its tween only afterwards. The
contract suite checks completion time and state for every easing.